Installation steps and responsibilities – Polycom SpectraLink 6300 MCU User Manual
Page 8

Facility Preparation: SpectraLink 6000 System: SpectraLink 6300 MCU
PN: 1725-36121-001_J.doc
8
Installation Steps and Responsibilities
9
Task
Description
Wire
Contractor or
Electrician
Field
Service
Engineer
Customer
Project Mgr/
Sys Admin
Site
Preparation
Required materials provided by customer
9
Prepare location and arrangement of
shelves
9
Prepare –48V power for shelves
9
Run cables to Base Stations
9
Terminate cables at Base Stations
9
Prepare and install demarc blocks
9
Program Telephone System ports
9
Connect cables from Base Stations and
phone lines to demarc blocks
9
Wire demarc blocks for Interface Modules
9
Install Shelves and Interface Modules
Survey site and check components
9
Install
shelves
9
Install junction panel
9
Connect power to shelves
9
Install cards in shelves
9
Connect junction panel
9
Connect demarc blocks to Interface
Modules
9
Install Base Stations
Install Base Stations in ceilings
9
Install Outdoor Base Stations
9
Check System Diagnostics
9
Initialize
System
9
Program Wireless Telephone features
9
Test System and Certify Site
9