beautypg.com

Day two – Polycom SpectraLink 6300 MCU User Manual

Page 42

background image

Facility Preparation: SpectraLink 6000 System: SpectraLink 6300 MCU

PN: 1725-36121-001_J.doc

42

Day two

The Polycom field service engineer will assist with training of the
end-user and verify that all questions are answered. Our engineer will
usually be on-site from 9 a.m. to 3 p.m. Activities will include the
following:
1. Assists with hand out and training of handset users.
2. Remain on site for a couple hours to answer any questions from

users/administrator.

3. Has customer contact/system administrator sign the installation

acceptance document.