beautypg.com

PB Heat DE User Manual

Page 11

background image

9

C. PIPING FOR ZONED SYSTEMS

1. See Figures 3.5 and 3.6 for basic zoned system

layouts.

2. Run each zone pipe down then up to zone to

prevent air accumulation in piping.

3. If required, provide means to isolate and drain each

zone separately.

Figure 3.5:

Zone Piping with Zone Valves

Figure 3.6:

Zone Piping with Circulators

WATER PIPING AND CONTROLS