beautypg.com

Ab c – Premier Mounts PBM-070L User Manual

Page 5

background image

PBM-070L

Installation Manual

Page - 5 -

Ceiling Installation

Step 1. Separate the top bridge from the base box by removing the six (6) M6 x 12 mm screws that are located on the base box, three

on each side (A).

Step 2. Secure the top bridge to the ceiling structure at this time (see warning label) using commercially available hardware (B).
Step 3. Use the two (2) middle slot openings for single wood stud mounting. All other mounting points on the top bridge may be

used depending on your installation application (B).

Step 4. Replace the base box to the secured top bridge and secure with the six M6 x 12 mm screws (C).

Base Box

Lag Bolts

(Commercially Available)

Ceiling Structure

Wood Stud

Top Bridge

A




B











C