Ab c – Premier Mounts PBM-070L User Manual
Page 5

PBM-070L
Installation Manual
Page - 5 -
Ceiling Installation
Step 1. Separate the top bridge from the base box by removing the six (6) M6 x 12 mm screws that are located on the base box, three
on each side (A).
Step 2. Secure the top bridge to the ceiling structure at this time (see warning label) using commercially available hardware (B).
Step 3. Use the two (2) middle slot openings for single wood stud mounting. All other mounting points on the top bridge may be
used depending on your installation application (B).
Step 4. Replace the base box to the secured top bridge and secure with the six M6 x 12 mm screws (C).
Base Box
Lag Bolts
(Commercially Available)
Ceiling Structure
Wood Stud
Top Bridge
A
B
C