Package checklist, Preparation – Paradyne Hotwire 8300 User Manual
Page 2

2
Package Checklist
Verify that your package contains the following:
❑
8300 Endpoint
❑
Power cord
❑
8-pin modular cable for connection to the DSL network
❑
Ferrite choke for the Ethernet cable
A DB9-to-DB9 cable for connection to an asynchronous terminal or PC (personal
computer) is included with some models.
Preparation
Make sure you have:
❑
A dedicated, grounded power outlet that is protected by a circuit breaker within
6 feet of the 8300 Endpoint
❑
A clean, well-lit, and ventilated site that is free from environmental extremes
❑
One to two feet of clearance for cable connections
❑
An asynchronous terminal or PC
❑
A physical connection to the G.shdsl line
❑
A physical connection to an Ethernet LAN, if used, and an 8-pin modular cable
❑
A physical connection to a router, if used, and an appropriate shielded serial cable
❑
A physical connection to a PBX, if used, and an RJ48C modular cable
For additional information, see the
8300 User’s Guide.
Before you install the unit, please refer to the
Be sure to register your warranty at www.paradyne.com/warranty.