Lennox Hearth MERIT PLUS MP-36OD User Manual
Page 14

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
14
Next, slide roof fl ashing over extended chimney 
section that previously has been installed above 
the roof opening in Step 4. FTF8 fl ashings 
require fl ashing spacers. Slide fl ashing all the 
way down until the fl ashing base rests fl at on 
the roof (Figure 38). Again, check the vertical 
position of the chimney and the 1"* minimum 
air space to combustibles.
Step 9. Security Chimneys locking bands, Model 
FLB, may be required if the chimney extends 
too high above the roof fl ashing. As a general 
rule, if the chimney extends more than 6' above 
the roof fl ashing, the use of locking bands is 
advisable to strengthen the chimney assembly. 
Align the locking band at the chimney joint. 
Locking bands wrap around pipe joints equally 
covering the joints of both pipe sections. Use 
the nut provided and TIGHTEN snugly. Do not 
overtighten as this might damage the chimney 
section (refer to Figure 40).
Note: If chimney extends more than 8' above 
roof surface, guy wires are also recommended. 
Use three (3) guy wires, attach to locking 
band assembly, extend and secure to roof in a 
triangular pattern (see Figure 41). Guy wires 
are not supplied by the manufacturer.
Step 8. The standard Security FTF8 roof fl ash-
ing assemblies include a storm collar. Slide 
the storm collar over outer chimney, rest on 
fl ashing spacers and align with top surface of 
fl ashing. Insert tab in slot, pull tight and bend 
tab back over slot. Seal storm collar to outer 
chimney with roof caulking or mastic around 
entire circumference of pipe. Also add extra roof 
caulking to the tab/slot area to seal completely 
against water penetration (Figure 40). Check all 
joints very carefully to ensure no water intrusion 
can take place.
Note: Do not apply excessive pressure to any 
subsequent chimney sections following the 
stabilizer when installing. Ensure each subse-
quent chimney section is securely attached by 
testing as noted in Step 4.
Step 6. Select the proper Security Chimneys 
roof fl ashing based on pitch of roof. Use chart 
below for selection:
Figure 37
Note: Do not caulk or seal the ventilating open-
ings or seal the fl ashing at the chimney.
Step 7. Secure fl ashing by nailing along the 
perimeter into roof using 8d nails. If shingled 
roof, slide upper end and sides of roof fl ash-
ing under shingles (trim if necessary), seal the 
top and both sides of the fl ashing to the roof 
with roof caulking. Cover nail heads with roof 
caulking (Figure 39).
*Note: 2" clearance to combustibles required 
in Canada.
FTF8-S4 Stabilizer
FTF8 Chimney
FTF8 Flashing
Flashing Spacers
Do Not Seal
Locking Band
Mastic
Figure 38
Figure 39
Figure 40
Roof Pitch
Model
Flat to 6/12
F8F6
6/12 to 12/12
F8F12
Roof Ridge
120
°
Figure 41
Step 10. Using a FTF8-CTD or FTF8-CTDT 
Round Termination:
1. Hold the FTF8-CTD (or CTDP) over top of 
last chimney section (Figure 42).
2. Center inner slip section in inner fl ue pipe-
slip down.
CTD
Termination
Chimney
Figure 42
3. Center outer locking section over outer fl ue 
pipe. Push down until locking tabs are fi rmly 
engaged.
4. Pull up slightly on CTD to ensure locking 
joint has fi rmly engaged.
Using a FTF8-CTD, FTF8-CTDT (or CTDTM) 
Chase Termination:
Refer to specific installation instructions 
(750,014M) included with the FTF8-CTDT (or 
750,205M for FTF8-CTDTM) chase termination 
for clearance and installation details.
Using a FTF8-CT1 or FTF8-CT1P Chase 
Termination:
Refer to specific installation instructions 
(750,015M) included with FTF8-CT1 chase 
terminations for clearance and installation 
details.
Using a FTF8-CT2 Chase Termination:
Refer to specific installation instructions 
(750,016M) included with FTF8-CT2 chase 
terminations for clearance and installation 
details.
Using a FTF8-CTT Chase Termination:
Refer to specific installation instructions 
(750,077M) included with FTF8-CTT chase 
terminations for clearance and installation 
details.
FTF8-CTD or 
FTF8-CTDT
Termination
