beautypg.com

Hydronic piping, Primary / secondary piping, Installation & service manual – Lochinvar 000 - 500 User Manual

Page 32

background image

32

4

Hydronic piping

Installation & Service Manual

Primary / Secondary Piping

Figure 4-8_Multiple Boilers Zoned with Circulators

EXPANSION

TANK

AIR SEPARATOR

PRESSURE

REDUCING

VALVE

BACK FLOW

PREVENTER

BALL VALVE

(TYPICAL)

PRESSURE RELIEF

VALVE

(TYPICAL)

FLOW CHECK

VALVE (TYPICAL)

INDIRECT DHW

TANK

BOILER 1

PRESSURE

GAUGE

DRAIN

( TYPICAL )

DRAIN POINT

(TYPICAL)

COLD WATER IN

HOT WATER OUT

MAKE UP WATER

Y-STRAINER

(RECOMMENDED)

(TYPICAL)

TEMPERATURE

LOOP 1

TEMPERATURE

LOOP 2

TEMPERATURE

LOOP 3

BOILER 2

TO

SY

STE

M

FR

OM

SY

STE

M

DOMESTIC

HOT WATER

CIRCULATOR

BOILER CIRCULATOR

TEMPERATURE /

PRESSURE GAUGE

( TYPICAL)

UNION (TYPICAL)

ANTI-SCALD

MIXING VALVE

SYSTEM SUPPLY

SENSOR

( WHEN USED )

PRESSURE

RELIEF

VALVE

MAY

SUBSTITUTE LOW

LOSS HEADER

NOT EXCEED

12" APART

DRAIN

FLOW CHECK

VALVE

Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.

NOTICE

This manual is related to the following products: