beautypg.com

Hydronic piping, Piping of the boiler system – Lochinvar 000 - 500 User Manual

Page 26

background image

26

4

Hydronic piping

Installation & Service Manual

9.

Inspect the liquid level in the expansion tank. The
system must be full and under normal operating
pressure to ensure proper water level in the expansion
tank. Ensure that diaphragm type ex pan sion tanks are
properly charged and not water logged.

10. Start the boiler according to the Section 6 - “Start-Up

Instructions” in this manual. Operate the system,
including the pump, boiler and radiation units, for one
hour.

11. Recheck the water level in the expansion tank. If it

exceeds half the tank volume, open the tank to reduce
the water level. Recheck pres sure charge on diaphragm
type tanks.

12. Shut down the entire system and vent all ra di a tion units

and high points in the system.

13. Close the water makeup valve and check the strainer and

pressure reducing valve for sediment or debris. Reopen
the water makeup valve.

14. Verify system pressure with the boiler pres sure gauge

before beginning regular operation.

15. Within three days of start-up, recheck and bleed all air

vents and the expansion tank using these instructions.

TABLE - 4B

SYSTEM TEMPERATURE RISE CHART

Based on Boiler Output in Btu/hr

Btu/hr

20°F

T

30°F

T

40°F

T

Input

Output

GPM

Ft/hd

GPM

Ft/hd

GPM

Ft/hd

315,000

258,300

26.0

4.1

17.3

2.2

13.0

1.3

360,000

295,200

29.7

5.4

19.8

2.5

14.9

1.5

399,999

327,180

--

--

22.0

3.6

16.5

2.0

500,000

410,000

--

--

27.6

6.6

20.7

3.5

Piping of the Boiler System

The drawings in this section (see FIG’s 4-4 through 4-6) show
typical heating boil er piping installations. Before beginning the
in

stal

la

tion, consult local codes for specific plumb

ing

re

quire

ments. The installation should provide unions and

valves at the inlet and outlet of the boil er so it can be isolated for
service. The boiler cir cu lat ing pump, air sep a ra tor, expansion
tank and oth er components required for proper installation
must be purchased locally. An air separation device must be
supplied in the in stal la tion piping to eliminate trapped air in
the system. Lo cate a system air vent at the highest point in the
sys tem. The system must also have a properly sized expansion
tank installed. Typically, an air charged di

a

phragm-type

expansion tank is used. The expansion tank must be installed
close to the boiler and on the suction side of the system pump
to ensure proper op er a tion.

ƽ CAUTION

This boiler system should not be operated at
less than 12 PSIG.

This manual is related to the following products: