beautypg.com

Determine boiler location, Installation & operation manual – Lochinvar SYNC 1.0 User Manual

Page 8

background image

Installation & Operation Manual

8

6" (152.40 MM)

FRONT

24" (610 MM)

REAR

0"

LEFT

OPEN FRONT

13" (330 MM)

TOP

1" (25 MM) MINIMUM CLEARANCE

AROUND HOT WATER PIPES

AND VENT PIPE

0"

RIGHT

Figure 1-2 Alcove Installation - Minimum Required Clearances

1" (25 MM) MINIMUM CLEARANCE

AROUND HOT WATER PIPES

AND VENT PIPE

6" (152 MM)

FRONT

4" (330 MM)

TOP

0"

LEFT

0"

RIGHT

24" (610 MM)

REAR

6" (152 MM)

VENTILATING*

AIR OPENING

VENTILATING*
AIR OPENING

CLOSED DOOR

*AREA OF EACH OPENING:
1 SQ. INCH PER 1000 BTU PER HOUR INPUT
WITH A MINIMUM OF 100 SQ. INCHES

Figure 1-1 Closet Installation - Minimum Required Clearances

ƽ WARNING

For closet installations, CPVC or
stainless steel material MUST BE
used in a closet structure due to
elevated temperatures. Failure to
follow this warning could result in
fire, personal injury, or death.

RECOMMENDED SERVICE
CLEARANCES:

Front

- 30" (762 mm)

Top

- 24" (610 mm)

Left Side - 24" (610 mm)
Rear -

24" (610 mm)

1

Determine boiler location

RECOMMENDED SERVICE
CLEARANCES:

Front

- 30" (762 mm)

Top

- 24" (610 mm)

Left Side - 24" (610 mm)
Rear -

24" (610 mm)

ƽ WARNING

For alcove installations, CPVC or
stainless steel material MUST BE
used in an alcove structure due to
elevated temperatures. Failure to
follow this warning could result in
fire, personal injury, or death.