beautypg.com

Hydronic piping, Installation & operation manual – Lochinvar SYNC 1.0 User Manual

Page 30

background image

Installation & Operation Manual

SYSTEM

CIRCULATOR

AIR

SEPARATOR

MAKE UP

WATER

DRAIN POINT

(TYPICAL)

SYSTEM SUPPLY

SENSOR

BALL VALVE

(TYPICAL)

MODULE 1
BOILER PUMP

PRESSURE RELIEF

VALVE

FLOW CHECK

VALVE (TYPICAL)

PRESSURE REDUCING

(VALVE)

EXPANSION

TANK

UNION (TYPICAL)

TEMPERATURE/

PRESSURE GAUGE

DRAIN (TYPICAL)

BACK FLOW
PREVENTER

PRESSURE GAUGE

MODULE 2
BOILER PUMP

FROM SYSTEM

TO

SYSTEM

Figure 5-6 Multiple Boilers - Primary/Secondary Piping

Model

Number of Units

2

3

4

5

6

7

8

Manifold Pipe Sizes in Inches (mm)

1000

4 (102)

5 (127)

6 (152)

6 (152)

8 (203)

8 (203)

8 (203)

1300

5 (127)

5 (127)

6 (152)

8 (203)

8 (203)

8 (203)

8 (203)

1500

5 (127)

6 (152)

6 (152)

8 (203)

8 (203)

8 (203)

10 (254)

5

Hydronic piping

NOTICE

System flow should always remain higher than the required flow for the boiler(s) when the boiler(s) is in
operation to prevent short cycling and high limit issues.

30

NOTICE

A system supply sensor (factory
supplied) MUST BE installed for proper
boiler operation.