Cable installation, Wiring preparation, Power cable installation – Liebert UPStation GXT User Manual
Page 10: Able, Nstallation, Iring, Reparation, Ower, Caution
6
CABLE INSTALLATION
W
IRING
P
REPARATION
For access to terminal blocks, see diagrams on
page 4.
P
OWER
C
ABLE
I
NSTALLATION
Refer to the chart below when selecting cables:
!
CAUTION
Please read this section
thoroughly before attempting to
install wiring to this unit.
Be sure that the unit is not
connected to any AC mains power
source or UPS before installing
any wiring to this unit. This should
be installed by a qualified/certified
electrician.
NOTE
The 120V loads need to be balanced on
the UPS output. To do this, when
connecting 120V equipment to the
Maintenance Bypass, start at one end of
the output modules and fill in toward the
other end. Load balancing must be
performed with the UPStation
GXT6000T - 208X and 240X. It is not
required on the GXT6000T-208 because
the unit has no 120V output.
Power Cable and Protection Ratings
208V
240V
Max Input Current
30 A
30 A
Input Protection
40 A
40 A
Max Output Current
30 A
30 A
Terminal Block Details
Max: 16 mm
2
(6 AWG)
Min: 2.5 mm
2
(14 AWG)
Torque: 2 Nm (16 in/lb)
NOTE
Customer must supply power cables
between Maintenance Bypass and UPS,
utility and load. (GMB12 models are
supplied with an attached input power
cord complete with L14-30 plug.)