Diagrams, F-10, Twist-mate cable plug installation instructions – Lincoln Electric IDEALARC CV-400-I User Manual
Page 38: Cv-400-i
F-10
DIAGRAMS
F-10
CV-400-I
TWIST-MATE CABLE PLUG INSTALLATION INSTRUCTIONS
TURN THE POWER SWITCH OF THE WELDING POWER
SOURCE "OFF" BEFORE INSTALLING PLUGS ON CABLES
OR WHEN CONNECTING OR DISCONNECTING PLUGS TO
WELDING POWER SOURCE.
1.
WELDING CABLE
BOOT
TRIM
Slide the copper tube into the brass plug.
Insert cable into copper tube.
COPPER TUBE
Slide rubber boot over brass plug. The rubber boot must be
positioned to completely cover all electrical surfaces after
the plug is locked into the receptacle.
SET SCREW
BRASS PLUG
BOOT MARKING
2
2
50-70
70-95
CABLE SIZE
1/0-2/0
CABLE SKIN LENGTH
1 INCH (25.4mm)
2.
2/0-3/0
50-70
70-95
mm )
mm )
(
(
AMERICAN (EUROPEAN) RANGE
CHECK THAT THE CONNECTOR BOOT IS MARKED FOR THE
APPROPRIATE CABLE SIZE PER TABLE BELOW; AND
SKIN CABLE JACKET TO LENGTH SPECIFIED:
1 INCH (25.4mm)
35-50
2
mm )
( 35-50
#2-#1
TWIST-MATE WELDING CABLE PLUG INSTALLATION INSTRUCTIONS
9-20-91J
1.5 INCH (38.1mm)
must apply firm pressure against welding cable. The top of the
(70-95 size may
have 2 set
screws)
SEE
ABOVE
Tighten set screw(s) to collapse copper tube. Screw(s)
brass plug after tightening.
set screw(s) will be nearly flush or below the surface of the
7.
6.
5.
4.
3.
Slide rubber boot onto cable end.
If necessary, trim cable end of boot at groove(s) to match cable
diameter. Boot must fit tightly enough to seal around outside
different cable diameters without trimming. These boots do not
based lubricant will help to slide the boot over the cable.
have grooves at the cable end. Soap or other non petroleum
diameter of cable. NOTE: Some boots are designed to accommodate
S18737