Table 1 – Liebert 600T User Manual
Page 30

24 Wiring Inspection
Table 1
Power Wiring Terminals - Factory Supplied
UPS Module Rating
kVA
Connection Type
500-750 kVA
Bus bars for connecting hardware (with 3/8” holes on 1.75” centers) are provided
for bypass input, critical load output and DC wiring terminations. DC bus bars for
625-750 kVA modules are designed for top entry and are located adjacent to the
input circuit breaker. Rectifier input wiring is top-entry, directly to lugs on top of
the input circuit breaker. Field-supplied lugs are required.
EXCEPTION: 500 kVA UPS modules with the 6-pulse rectifier and no input
isolation transformer have rectifier input bus bars exactly like those described
above for bypass and critical load termination.
Use 75°C copper wire. Select wire size based on the ampacities in Table 310-16 (see Table 3 of this manual)
and associated notes of the National Electrical Code (NFPA 70).
Use commercially available solderless lugs for the wire size required for your application. Refer to Appendix B
- Field Supplied Lugs. Connect wire to the lug using tool and procedure specified by the lug manufacturer.
Table 2
Torque Specifications
Nut and Bolt Combinations
Bolt Shaft Size
Grade 2
Standard
Electrical Connections
with Belleville Washers
Lb-in
N-m
Lb-in
N-m
1/4
53
6.0
46
5.2
5/16
107
12
60
6.8
3/8
192
22
95
11
1/2
428
48
256
29
Circuit Breakers With Compression Lugs (For Power Wiring)
Cable Size or Range
Lb-in
N-m
#6 - #4
100
11
#3 - #1
125
14
1/0 - 2/0
150
17
3/0 - 200 MCM
200
23
250 - 400 MCM
250
28
500 - 700 MCM
300
34
Terminal Block Compression Lugs (For Control Wiring)
AWG Wire Size or Range
Lb-in
N-m
#22 - #14
3.5 to 5.3
0.4 to 0.6
Use the values in this table unless the equipment is labeled with a
different torque value.