beautypg.com

Sg/sg-d, Barrier gate arm installation for model – Linear SG-D User Manual

Page 7

background image

MODEL BGUS/BGUS-DSG/SG-D OPERATOR INSTALLATION GUIDE

-7-

BARRIER GATE ARM INSTALLATION FOR MODEL

SG/SG-D

1. Assemble the SG arm on the ground fi rst, making sure

to leave all fasteners loose, including the spreader
arms (#4 & #7 above).

2. Make sure the barrier gate is in the full closed

position.

3. With someone’s assistance, lift the arm up to a height

even with the barrier gate fl ange. The far end should
either be supported by something of equal height as
the fl ange, or be held by someone throughout the next
steps.

4. Assemble the wood arm between the attachment

channel (#8) and the fl ange and bolt together. Tighten
these bolts fi rmly.

5. Tighten all bolts where the three pieces of wood arm

come together.

6. Tighten up the nuts (#6) on the spreader arms (#4 & #7)

until the plates (#5) are tight against the wood.

7. The arm should have a curved, wishbone appearance

once fi nished.

This manual is related to the following products: