Delivery day, Installation day, Layout considerations – Kodak I1860 User Manual
Page 7
A-61578 September 2006
5
Delivery day
On delivery day:
• Inspect the scanner packaging for any damage.
• Move the scanner to the unpacking area.
• Notify Kodak of a successful delivery.
Installation day
• On installation day, in addition to the Kodak Field Engineer, the
following people need to be available:
- Site Computer Administrator
- Integrator
- All scanner operators. If there are more than three operators, an
additional fee may be charged for extra operators. Contact Kodak
prior to training.
• The Kodak Field Engineer will unpack the scanner and verify
functionality.
• The scanner will be moved to its final location.
• The Computer Administrator will install the FireWire card and drivers.
• The Kodak Field Engineer will train up to three operators on the
operation of the scanner. Kodak will not train on the host scanner
application.
• The operators may also be trained by the Integrator following the
Kodak-provided training.
Layout considerations
The following should be considered when selecting a site for the i1860
Scanner.
Position the scanner to allow for:
• Clearance space between other equipment and doorways.
• The scanner is height adjustable. Therefore, a minimum of 4 inches
of clearance is required on all sides to avoid potential injury as the
workspace table is raised or lowered. More space will be required for
service access.
• When positioning the scanner, make sure the electrical power outlet
is located within 1.52 meters (5 feet) of the scanner and is easily
accessible.
Position the scanner away from:
• Potential flooding and dampness areas, especially in basement
areas.
• Open flame, excessively dusty areas or direct sunlight.