Check and test operation, Check – Samsung APC3240C User Manual
Page 34

E-
34
CHECK AND TEST OPERATION
Check
◆
Be sure to check the following again after completion of installation.
1. Check the piping connection area for any gas leakage.
2. Is the drain hose properly connected?
3. Is the insulation of the piping in good condition?
4. Is grounding properly made?
Outdoor
connection area
Indoor
connection area
16
13"
30cm( 11 )
Insulation
See also other documents in the category Samsung Conditioners:
- AQ09VBLX (60 pages)
- AQ07S8GE (26 pages)
- AQT24S6GE (28 pages)
- AWH126JE (5 pages)
- SC05ZZ8X (24 pages)
- AW-1407B (5 pages)
- AQV09KBBX (1 page)
- UST18S0GE (24 pages)
- AS12CM2N (28 pages)
- AQB12JJWC (26 pages)
- AQT24P6GE (26 pages)
- AS18S0GB (24 pages)
- AQT18WJWE (28 pages)
- AS24J (20 pages)
- AMF18C2E (24 pages)
- AST24A1(A2)QE/B (24 pages)
- AVMCC105CA0 (16 pages)
- AQ09A5(6)MAF (28 pages)
- AS09HPAN (28 pages)
- AS120VE/D (24 pages)
- AFPCC052CA0 (36 pages)
- AS18B1 (24 pages)
- AS24B1 (24 pages)
- AM14B1(B2)E07 (24 pages)
- AS07A5(6)MA (26 pages)
- AM 14A1(B1)E07 (24 pages)
- AQV24J (26 pages)
- ACC2800C (70 pages)
- AQ30C1(2)BC (48 pages)
- AM18B1(B2)C09 (25 pages)
- AQT18A1(A2)QE/B (26 pages)
- AS07A5(A6)MA (46 pages)
- AQ09A2MD (28 pages)
- XMH26ZV (26 pages)
- WC12ZR (18 pages)
- AM27A1C13 (46 pages)
- AQ12FEX (24 pages)
- AW18ECB8XAA (22 pages)
- AW0593L-XAA (28 pages)
- AW25ECB7XAA (29 pages)
- AW05NCM7XAA (20 pages)