Introduction – Siemens JFR Distribution Step Voltage Regulator 21-115532-001 User Manual
Page 6
INTRODUCTION
Page 2
INSPECTION FOR
STORAGE PRIOR TO
DAMAGE IN SHIPMENT
INSTALLATION
Check each item with the shipping manifest immediately
upon receipt of the regulator. Make a thorough visual in-
spection of the regulator. Check for evidence of damage
attributable to mishandling in shipment. Should any short-
age or damage be found, notify the local agent of the carrier
making the delivery and make appropriate notation on the
freight bill. Any damage or shortage that is not noted on the
freight bill becomes the recipients responsibility. A claim
should be made immediately with the carrier. Please also
notify your Siemens representative as soon as possible.
Assure that the control compartment enclosure is tightly
closed, and regulator tank is sealed.