beautypg.com

8 certification test – SpectraLink 150 M3 MCU User Manual

Page 61

background image

SpectraLink Corporation

Link WTS Installation and Operation

Part Number: 72-0075-01-C-W.doc

Page 50

13.8 Certification Test

When the OAI Telephony Gateway is properly connected to the application server, the
LEDs should look like this:

Power

On

Error

Off

LED 1

LED 2

LED3/IPC

On

LED4/SD

On when sending data to server

LED5/RD

On when receiving data from server

To test the Wireless Telephones:

If this is a new installation, continue with Wireless Telephone registration and PBX
programming, and perform the usual voice and coverage tests when Wireless
Telephone installation is complete.

If you added the OAI Telephony Gateway to an existing system, place a call and test
the features on each Wireless Telephone to be sure the system is working properly.

Test the application on each Wireless Telephone. The

SD

and

RD

LEDs should be on

when the OAI Telephony Gateway is communicating with the server (at least every
30 seconds). Consult your application provider for specific test procedures.