Contact samsung worldwide – Samsung SP-A400B User Manual
Page 36

When handling the lamp, avoid touching any part of it except for the handles. If you handle the lamp
incorrectly, it may affect the screen quality and shorten its lifetime.
The projector is will not operate normally if the cover is not locked completely after lamp replacement. If your
projector does not operate normally, refer to the
LED Indications
.
Lamp Replacement Procedure
The lamp is very hot and operates
with a high voltage. Allow it to cool
down for at least 1 hour after
disconnecting the power cord
before changing the lamp.
The lamp is located at the bottom
of the product.
Place the product so that its
bottom looks upward and remove
the screws that hold the lamp
cover in place.
* When placing the product with
the bottom upwards, make sure to
place a soft cloth on the floor to
prevent scratches.
Slide and open the cover in the
direction of the arrow, as shown in
the figure.
Remove the screw indicated in the
figure.
Hold and pull the lamp handle
slightly, as shown in the figure.
Assembling a new lamp is in the reverse order of the disassembly.
|
Care and Maintenance
|
Contact SAMSUNG WORLDWIDE
|
Other
|
Authority
|
If you have any questions or comments relating to Samsung products,
please contact a SAMSUNG customer care center.
North America
U.S.A
1-800-SAMSUNG (726-7864)
http://www.samsung.com/us
CANADA
1-800-SAMSUNG (726-7864)
http://www.samsung.com/ca
MEXICO
01-800-SAMSUNG (726-7864)
http://www.samsung.com/mx