beautypg.com

Southbend STRE-3EZ User Manual

Page 6

background image

O

PERATION

S

TRATO

S

TEAM

C

OUNTERTOP

S

TEAMER

P

AGE

6

OF

44 O

WNER

S

M

ANUAL

1185184

E

LECTRICAL

R

EQUIREMENTS

One fused electrical connection is required to the contactor of each steamer. All steamers are shipped per customer
order, three phase or single phase. (A kit is available for field conversion to three phase or single phase.) The fused
connection must be wired for the required voltage and maximum amperage as listed in the chart below:

Voltage

Total Connected Amps

Model STRE-3EZ

Model STRE-5EZ

1 Phase

3 Phase

1 Phase

3 Phase

208 V 60 Hz

44

26

53

31

220 V 50/60 Hz

41

24

51

29

240 V 60 Hz

38

22

46

27

W

ATER

R

EQUIREMENTS

To meet warranty requirements, the water supply must be as follows:

Total Dissolved Solids (TDS)

60 PPM or less

Hardness

2 grains (35 PPM) or less

pH

7.0 to 7.5

Maximum Reservoir Capacity

3.0 gallons

Typical usage is 3.0 gallons in 4 hours.

In order to minimize service problems and to meet the warranty requirements, a water treatment system (softener) is
recommended when water quality does not meet the limits stated above.

D

RAIN

R

EQUIREMENTS

Water drains into a pan attached to the bottom of the steamer. Pan pulls out for periodic dumping.