41 transparency lead-in sequence, 42 configuration lead-in sequence, 43 transp./config. trailer sequence – Intermate Twinax Connection LX T-04 User Manual
Page 52: 45 job time-out

A p p e n d i c e s
52
U s e r ‘ s G u i d e
#41 Transparency Lead-In Sequence
Starts Multi-byte Transparency Mode.
Value
Description
Value
Description
(max 8 character codes)
*
(default)
#42 Configuration Lead-In Sequence
Starts Configuration Mode.
Value
Description
Value
Description
(max 8 character codes)
*
(default)
#43 Transp./Config. Trailer Sequence
Terminates the Transparency Multi-byte and Configuration Modes.
Value
Description
Value
Description
(max 8 character codes)
*
(default)
#45 Job Time-out
Timer value starting after a host job has ended. If the time-out value is reached
before any new data arrives at the Cobra+, the Start of Job Sequence (#046),
the Power-up Sequence (#090) and current emulator settings are sent before
next host job.
Value
Description
Value
Description
0
off (default)
1-255
Value in seconds.