STEP 7 (See Diagram 7 & Cable Loop Diagram)


A.) Attach the 133” Lower Cable (#53) to the opening on the Leg Developer (#17). Attach a Pulley

(#28) to the opening. Secure it with one 3/8” x 2 5/8” Allen Bolt (#60), two

½” Bushings

(#71), two

3/8” Washers (#77), and one 3/8” Aircraft Nut (#74).

B.) Draw the Cable underneath the Pulley to the open slot on the Vertical Beam (#4). Install

another Pulley as described in Step A.

C.) Draw the Cable underneath the Pulley then upward to the Angled Double Floating Bracket

(#24) previously installed. Attach a Pulley to the open bracket. Secure it with one 3/8” x 1 ¾”
Allen Bolt (#61), two

3/8” Washers (#77), and one 3/8” Aircraft Nut (#74).

D.) Draw the Cable around the Pulley the downward to the open bracket on the Main Base Frame

(#2). Install another Pulley.

E.) Draw the Cable around the Pulley then upward to the Flat Double Floating Pulley Bracket

(#23) previously installed. Install another Pulley.

F.) Draw the Cable around the Pulley then connect the Cable to the Main Base Frame with two

Hooks (#46) and a 9-linked Chain (#49).

G.) Adjust the tension of the Cable Loop System by adjusting the length of the Chain.