beautypg.com

Anchor tackle, Final touches – Model Shipways 2003 User Manual

Page 19

background image

19

The vangs (43) are fitted port and starboard.
The plan does not clearly show where the
fixed end of the fall is located. Seize it to an
eyebolt in the deck close to the bulwark or on
top of the cap rail directly in line with the line
on the plan.

The main boom sheet (45) lower block is fit-
ted with a ring around the traveler rod on the
transom. The running end can be belayed port
or starboard to the cavils on the bulwark stan-
chions. The lead block on the deck can be
considered optional.

7. Anchor Tackle

Figure H-12 shows the anchors, port and star-
board, rigging and stowage. Coil the anchor
cables on the deck.

8. Final Touches

After all the rigging is in place, re-check every
line, and make sure all the seizings are sound.
If necessary, add another touch of CA glue to
seizings. Check to see if there are any shiny
places on the rigging. If necessary, tough-up
standing rigging with black paint, or black liq-
uid shoe polish. For running rigging, use a tan
stain, or brown liquid shoe polish.

Check to see if any of the painted wooden
parts were marred or scratched during the rig-
ging process and touch-up as necessary.

Congratulations—you’ve done it! We look for-
ward to helping you with your next ship
modeling project.

FIG. H-5 YARD LIFTS

FIG. H-6 TOPSAIL YARD CLEWLINES & SHEETS

FIG. H-7 YARD PARRELS

TACKLE

AT DECK

FIXED

FIXED

RUNNING

RUNNING

OPTION 1

OPTION

LOWER YARDS

& FORE TOPSAIL

TOPSAIL

YARD

LOWER

YARD

REAL SHIP

MODEL OPTION

MAIN TOPSAIL

& FORE TOPGALLANT

OPTION 1

NO BLOCKS AT CAP

TACKLE

AT DECK

BELAY AT

BULWARK

PIN RAIL

SHEET LEAD BLOCK

BELAY AT FIFE RAIL

YARD

COULD ALSO
ELIMINATE
THE HAULING
END

MAST

BELAY TO

DECK B ITTS

BEADS (10 PER YARD)

RIBS (6 PER YARD)

CLEWLINE

HOOK TOGETHER

SHEET

Below and on the following pages
are photos of the Dapper Tom
rigging on our prototype model.