beautypg.com

Xi. variations of rated supply pressures – Middleby Marshall Oven User Manual

Page 29

background image

2-29

SECTION 2

INSTALLATION

4. Replace cover screw on adjustment valve and turn off main

gas supply valve.

5. Record the reading obtained from the gas meter and

calculate obtained gas flow. Compare this to the indicated

flow in the CHART OF ORIFICE SIZES, GAS PRESSURES,

NOMINAL INPUT RATINGS AND GAS FLOW on Page 1.

6. Note the following comments and procedures to assure

correct gas supply pressure and adjusting the gas valve to

obtain proper orifice (manifold) pressure.

XI. VARIATIONS OF RATED SUPPLY

PRESSURES

Special attention should be given to the supply pressure and

gas flow pressure at the supply connection to the oven. The

nominal supply pressure for gas family Group 2 (natural gas)

should be 20 mbar.
If the supply pressure is lower or higher than the rated (nominal)

pressure then the reason should be investigated and the gas

supplier contacted.
If the supply pressure is lower than 17 mbar’s or higher than 25

mbar’s then the oven should be shut down and the gas supplier

notified. No adjustment of the oven controls should be made

and the oven should not be operated.

TO CHECK GAS SUPPLY PRESSURE:
1. Close main gas supply valve.
2. Remove supply (inlet) pressure measuring stud screw from

gas valve and attach the manometer to the stud.

3. Open main gas supply valve and restart oven with

temperature control at maximum setting.

4. Measure inlet (supply) pressure. For all natural gases this

should be between 17 and 25 mbar’s.

5. Turn oven off, close main gas supply valve, remove

manometer from stud and tighten cover screw in to pressure

measuring stud.

ORIFICE (MANIFOLD) PRESSURE METHOD:
1. Turn off main gas supply valve.
2. Remove pressure measuring stud screw located at the

“out-flow” (closest to gas burner) of the gas valve and attach

a manometer.

3. Remove cover screw from the gas valve pressure (governor)

adjustment valve.

4. Open main gas supply valve and start oven according to

supplied instructions with the temperature control at

maximum setting.

5. Once oven is in operation, adjust pressure valve (governor)

to the orifice pressure value as shown for the specific gas

in the Gas Specifications Table.

6. Turn oven off, close main gas supply valve, remove “U” tube

manometer and tighten cover screw into pressure measuring

stud.