beautypg.com

Installation – MGE UPS Systems 30A User Manual

Page 15

background image

34020113EN/AA

- Page 15

N

PEN

PE

PEN

S1

S2

N L1 L2 L3

N L1 L2 L3

N L1 L2 L3

PE

PE

PE

N

N

N

S1

S2

N L1 L2 L3

N L1 L2 L3

N L1 L2 L3

PE

PE

PE

S1

S2

N L1 L2 L3

N L1 L2 L3

N L1 L2 L3

2. Installation

Upsilon STS 400 to 600 A

Input:

3 phases + PE + Neutral

Output:

3 phases + PE + Neutral

See section 1.3 for information on accessing
the connections.
Connections are made using lugs connected
to two threaded studs per phase (diameter
10 mm).
The cables are tied to the earth bar.

See section 1.3 for information on
accessing the connections.
Connections are made using lugs
connected to two threaded studs per phase
(diameter 10 mm).
The cables are tied to the earth bar.

463
mm

403
mm

463
mm

403
mm

See section 1.3 for information on
accessing the connections.
Connections are made using lugs
connected to two threaded studs per phase
(diameter 10 mm).
The cables are tied to the earth bar.

463
mm

403
mm

Upsilon STS 400 to 600 A

Input:

3 phases + PEN

Output:

3 phases + PE

Upsilon STS 400 to 600 A

Input:

3 phases + PE

Output:

3 phases + PE