beautypg.com

Mark Levinson 433 User Manual

Page 24

background image

24

Mark Levinson

Refer to the table on the previous page and to the illustration below
for additional assistance. Refer to pages 20-21 for specific cable uses
and instructions.

3. When Link connections have been made, power on linked

components ONE AT A TIME in the order specified below. Allow
each component to complete its initialization sequence before
proceeding to the next component.

A. Digital Transports

B. Digital Audio Processors

C. Preamplifier

D. Power Amplifiers (begin with the first power amplifier in the

slave chain)

At this point, the front panel standby LEDs on all linked compo-
nents should be blinking in unison.

Note

Linked components must be powered on ONE AT A TIME in the specific
order listed in step 3 (above) to ensure proper functioning of Link controls.
DO NOT use a power strip switch to power on several components at
once. When power is supplied to a power strip, connected components
that do not include a power button will automatically power on.

4. Take the linked preamplifier out of standby.

All linked power amplifiers should come out of standby as
well. If this does not occur, repeat steps 3 and 4. If problems
persist, contact an authorized Mark Levinson dealer or
Customer Service at www.marklevinson.com.