beautypg.com

Pnsf31z—ge profile, Smartwater, Softening system – GE PROFILE PNSF31Z User Manual

Page 2: Revised 7/97, Extremely important, For answers to your monogram, Ge profile performance series, Ge profile

background image

Revised 7/97

PNSF31Z—GE Profile

SmartWater

Softening System

TM

MAIN SHUTOFF

VALVE

WATER METER

GROUND

STRAP

SECURED

HARD WATER TO HOUSE

INLET

OUTSIDE FAUCET

(HARD WATER)

OUTSIDE FAUCET

(HARD WATER)

SOFT, COLD

WATER

SOFT, HOT

WATER

1. BE SURE HARD WATER IS
PLUMBED INTO SOFTENER
VALVE INLET

2. BE SURE BYPASS VALVE STEM IS
POSITIONED FOR SOFT WATER "SERVICE"

3. BE SURE VALVE DRAIN HOSE RUNS
DIRECTLY TO AN ACCEPTABLE DRAIN
POINT, AND IS NOT PINCHED, KINKED
OR ELEVATED TOO HIGH IF RUN
OVER- HEAD. DID YOU PROVIDE AN
AIR-GAP AT THE DRAIN POINT?

4. THE BRINE TANK OVERFLOW
HOSE IS A GRAVITY DRAIN. BE
SURE THE HOSE IS NOT RAISED
HIGHER THAN THE FITTING ON
THE TANK AND IS SECURED

7. DID YOU FILL THE BRINE TANK
WITH SALT?

8. BE SURE THE ELECTRIC OR
FUEL SUPPLY TO THE WATER
HEATER IS ON

6. DID YOU SET THE TIMER TO THE
CORRECT TIME OF DAY, AND
WATER HARDNESS NUMBER?

5. IS THE TRANSFORMER PLUGGED
INTO A CONTINUOUSLY "LIVE"
120V-60Hz OUTLET?

WATER

SOFTENER

WATER

HEATER

EXTREMELY IMPORTANT

• Install softener at point-of-entry into house before water heater.
Needs to be within five feet of water inlet.

• Install within ten feet of proper drainage; e.g. drain, standpipe
or a sump which does not drain directly to outside.

• Within ten feet of 120V, 60Hz electrical outlet-
transformer must be plugged into an inside outlet.

• All units must be installed according to local plumbing and
electrical regulations.

NOTE: Should not be installed in
direct sunlight, freezing conditions,
or where unit can get wet.

For answers to your Monogram,

®

GE Profile

Performance Series,

GE Profile,

GE,

Hotpoint and RCA appliance questions, call
GE Answer Center

®

service, 800.626.2000.