7

removal, to allow service access and to insure proper venti-
lation and condenser airflow. The unit must not be installed
beneath any obstruction. The unit should be installed re-
mote from all building exhausts to inhibit ingestion of exhaust
air into the unit fresh air intake.

INSULATED
PANELS

ROOF CURB INSTALLATION

ROOF CURB POST-INSTALLATION

CHECKS

After installation, check the top of the curb, duct connection
frame and duct flanges to make sure gasket has been ap-
plied properly. Gasket should be firmly applied to the top of
the curb perimeter, duct flanges and any exposed duct con-
nection frame. If gasket is loose, re-apply using strong
weather resistant adhesive.

P

ROTRUSION

Inspect curb to ensure that none of the utility services (elec-
tric) routed through the curb protrude above the curb.

I

F

 

PROTRUSIONS

 

EXIST

DO

 

NOT

 

ATTEMPT

 

TO

 

SET

 

UNIT

 

ON

 

CURB

I

NFORMATION

 

SHOWN

.

CAUTION

ROOF TOP DUCT CONNECTIONS

Install all duct connections on the unit before placing the unit
on rooftop.

RIGGING DETAILS

T

O

 

PREVENT

 

PROPERTY

 

DAMAGE

THE

 

UNIT

 

SHOULD

 

REMAIN

 

IN

 

AN

 

UPRIGHT

 

POSITION

 

DURING

 

ALL

 

RIGGING

 

AND

 

MOVING

 

OPERATIONS

T

O

 

FACILITATE

 

LIFTING

 

AND

 

MOVING

 

WHEN

 

A

 

CRANE

 

IS

 

USED

PLACE

 

THE

 

UNIT

 

IN

 

AN

 

ADEQUATE

 

CABLE

 

SLING

WARNING

D

O

 

NOT

 

LIFT

 

UNITS

 

TWO

 

AT

 

A

 

TIME

. P

ROVISIONS

 

FOR

 

FORKS

 

HAVE

 

BEEN

 

INCLUDED

 

IN

 

THE

 

UNIT

 

BASE

 

FRAME

. M

INIMUM

 

FORK

 

LENGTH

 

IS

 72” 

TO

 

PREVENT

 

DAMAGE

 

TO

 

THE

 

UNIT

.

CAUTION

Provisions for forks have been included in the unit base frame.
No other fork locations are approved.

T

O

 

PREVENT

 

POSSIBLE

 

EQUIPMENT

 

DAMAGE

PROPERTY

 

DAMAGE

PERSONAL

 

INJURY

 

OR

 

DEATH

THE

 

FOLLOWING

 

BULLET

 

POINTS

 

MUST

 

BE

 

OBSERVED

 

WHEN

 

INSTALLING

 

THE

 

UNIT

.

WARNING

Unit must be lifted by the four lifting holes located at
the base frame corners.

Lifting cables should be attached to the unit with
shackles.

The distance between the crane hook and the top of
the unit must not be less than 60”.

Two spreader bars must span over the unit to prevent
damage to the cabinet by the lift cables. Spreader
bars must be of sufficient length so that cables do not
come in contact with the unit during transport.
Remove wood struts mounted beneath unit base
frame before setting unit on roof curb. These struts
are intended to protect unit base frame from fork lift
damage. Removal is accomplished by extracting the
sheet metal retainers and pulling the struts through
the base of the unit. Refer to rigging label on the unit.

Important: If using bottom discharge with roof curb, duct-
work should be attached to the curb prior to installing the
unit. Ductwork dimensions are shown in Roof Curb Installa-
tion Instructions.

Refer to the Roof Curb Installation Instructions for proper curb
installation. Curbing must be installed in compliance with the
National Roofing Contractors Association Manual.

Lower unit carefully onto roof mounting curb. While rigging
unit, center of gravity will cause condenser end to be lower
than supply air end.