beautypg.com

GarrettCom 1008 User Manual

Page 44

background image

Magnum 1000 Workgroup Hubs Installation and User Guide (04/02)

38

www GarrettCom com

.

.

Note: Before connecting to Terminal Block of –48VDC, 24VDC or 125VDC,

always use a digital voltmeter to measure the output voltage of the power supply and
determine the lead which is more “+ve potential Lead”. The more “+ve” voltage
terminal lead from 48V or –48V Power supply must be connected to the post labeled
“+”.
The GND can be hooked at the last.
Disconnecting the DC power source is used to remove the unit from service, and as a

power-down to RESET the hub’s electronics if needed.

B4.1

UL Requirements

1. Minimum 14 AWG cable for connection to a Centralized DC power source.
2. Fastening torque of the lugs on the terminal block: 9 inch pound max.
3. Centralized DC Power Source cable securement, use at least four cable ties to

secure the cable to the rack at least 4 inches apart with the first one located
within 6 inches of the terminal block.

B5.0

OPERATION

Operation of the Magnum 1000’s with the optional -48VDC, 24VDC &

125VDC power supply is identical to that of the standard AC-powered models.

B6.0

ORDERING INFORMATION

To order the optional -48VDC power supply factory installed, add a suffix of

“-48VDC” after the product’s standard model #. Example:

Magnum 1016-48VDC.

Similarly for “24VDC”

: Magnum 1016-24VDC.

B7.0

TROUBLESHOOTING

Please refer to Section 6.0 for troubleshooting

This manual is related to the following products: