beautypg.com

2 mechanical installation, 1 table-top or shelf mounting – GE MULTILINK 1601-9026-A3 User Manual

Page 7

background image

QUICKSTART GUIDE

MULTILINK ETHERNET COMMUNICATIONS SWITCH – QUICKSTART GUIDE

3

2 Mechanical Installation

2.1 Table-top or Shelf Mounting

The Unit can be mounted on a table-top or any suitable horizontal surface. It has four
rubber feet to provide stability without scratching finished surfaces.

2.2 Rack Mounting - ML2400

Installation of a MultiLink Ethernet Switch in a 19-inch rack is a simple procedure. When
properly installed, the front-mounted LED status indicators should be in plain view and
easy to read. Rack-mount installation requires special 19-inch rack-mounted brackets and
screws (included with the Unit). These brackets attach to the front sides of the switch,
which is then typically fastened into a standard 19" RETMA rack as shown below.

FIGURE 1: Rack mounting

NOTE

Note

Please ensure 1U (1.75") gap is provided above each switch in the enclosure for heat
dissipation.

FIGURE 2: Mountings for Unit units rack-mounted in a frame

754733A1.CDR

754734A1.CDR