beautypg.com

Parts, hardware, accessory packages, Installation preparation, Parts provided – GE ZV541 User Manual

Page 9: Hardware package, Accessory package

background image

9

Installation Preparation

PARTS PROVIDED

Locate the parts packed with the hood.

HARDWARE PACKAGE

Locate and check
contents. Screws
shown actual size.

2 Grease trays (3 with 54" hood)

Implement rods with standoffs

Duct collar

Support frame for 8 ft. ceiling
with 4 large pan head screws
installed on the bottom corners.

2-piece decorative duct cover

Transition with Damper

Decorative top cover

2 Filters (3 with 54" hood)

ACCESSORY PACKAGE

Check accessory package.
Select the taller set for 9’6" to 10’4" ceilings.
Select the shorter set for 8’6" to 9’6" ceilings.
Discard unused set.

2 Templates

Allen Wrench

Screws A
4 (7/16")
hex head
wood
screws

Screws B
2 (1/8" x 1-1/2")
Phillips
pan head
screws.

Screws C
8 blunt point
Phillips
screws

Screw F
Blower safety screw and lock washer,
Phillips head M 6 x 16.
Note: Hardware appearance may vary slightly.

Screws E
2 Phillips
head wood
screws

2 Support Frames
with 8 height
adjustment
screws

2 Sets of Duct Covers

4 Attachment Screws

Screws D
2 small
Phillips
head
screws