Step 13, install supplied duct cover, top cover, Step 14, finalize installation, Installation instructions – GE ZV541 User Manual
Page 18
18
STEP 13 INSTALL SUPPLIED DUCT
COVER AND TOP COVER
STEP 14 FINALIZE INSTALLATION
• Check all lamps to assure tightness in sockets.
• Turn power on at the circuit breaker.
• Refer to the Owner’s Manual for operating and
cleaning instructions.
• Engage tabs into slots on each side at the top of the
hood. The covers should lay flat in the impression on
top of the hood.
Installation Instructions
• Install 2 Screws C to secure the cover to the hood at
the front and back.
• Install the supplied 2-piece duct cover over the
support frame (if using supplied frame). Snap ends
together.
• Secure duct covers to support frame with 2
Screws D.
• For a more finished appearance, a top cover is
supplied and should be installed whenever the top of
the hood is visible.
Screws D
Tabs
Tape
Screws C
Top Cover
Install Screws
Front and Back
Install Duct
Cover Screw
on Each Side
TIP: Place pieces
of tape over ends
of the cover to
prevent scratching
the duct cover.
Remove tape
before installing
screws.