beautypg.com

Installation, Installer checklist – Fisher & Paykel BGB48 User Manual

Page 24

background image

22

❏ Specified clearances main-

tained to combustibles.

❏ Verified proper enclosure

ventilation.

❏ All internal packaging and

any adhesive residue
removed. To remove stub-
born residue, use rubbing
alcohol or a commercially
available adhesive remov-
er.

❏ Removed shipping brack-

ets.

❏ Knobs turn freely, bezels

centered.

❏ Each burner lights satis-

factorily, individually or

with adjacent burner lit.

❏ Air shutters adjusted.

❏ Low flame setting satis-

factory.

❏ Drip pan in place properly

and sliding freely.

❏ Heat Shields are located

properly and in place.

❏ Pressure regulator con-

nected and set for 1 kPa
Natural, 2.75 kPa LPG gas.

❏ Manual shut-off valve

installed and accessible.

❏ Unit tested and free of

leaks.

❏ User informed of gas

supply shut-off valve
location.

❏ All radiants are assembled

and put in place.

❏ Check match lighting.

PLEASE LEAVE THESE

INSTRUCTIONS WITH THE
USER.

USER, PLEASE RETAIN

THESE INSTRUCTIONS
FOR FUTURE REFERENCE.

INSTALLATION

INSTALLER CHECKLIST

This manual is related to the following products: