beautypg.com

Equipment checklist, Package contents, Optional rack-mounting equipment – Foundry Networks 2402CF User Manual

Page 30: Equipment checklist -2

background image

I

NSTALLING

THE

S

WITCH

4-2

© 2003 Foundry Networks, Inc.

February 2003

suppressor is recommended.

Equipment Checklist

After unpacking the switch, check the contents to be sure you
have received all the components. Then, before beginning the
installation, be sure you have all other necessary installation
equipment.

Package Contents

24-Port Fast Ethernet Switch

Four adhesive foot pads

Bracket Mounting Kit containing two brackets and four
screws for attaching the brackets to the switch

Power Cord

RS-232 console cable

Stacking Cable

CD-ROM containing installation guide and user guide

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the
following equipment available:

Four mounting screws for each device you plan to install in a
rack—these are not included

A screwdriver (Phillips or flathead, depending on the type of
screws used)