Selecting a Site

Switch units can be mounted in a standard 19-inch equipment
rack or on a flat surface. Be sure to follow the guidelines below
when choosing a location.

The site should:

be at the center of all the devices you want to link and
near a power outlet.

be able to maintain its temperature within 0 to 50° C (32
to 122 °F) and its humidity within 10% to 90%,
non-condensing

provide adequate space (approximately two inches) on all
sides for proper air flow

be accessible for installing, cabling and maintaining the
devices

allow the status LEDs to be clearly visible

Make sure twisted-pair cable is always routed away from
power lines, fluorescent lighting fixtures and other sources of
electrical interference, such as radios, transmitters, etc.

Make sure that a separate grounded power outlet that
provides 100 to 240 VAC, 50 to 60 Hz, is within 2.44 m (8 feet)
of each device and is powered from an independent circuit
breaker. As with any equipment, using a filter or surge