7 gas conversion: procedures (cont.), 8 gas conversion components – Frymaster SM60 User Manual
Page 27
DEAN MILLIVOLT GAS FRYERS (NON-CE)
CHAPTER 3: INSTALLATION INSTRUCTIONS
3-11
3.7 Gas Conversion: Procedures (cont.)
Vessel Assembly
Gas Valve
Manifold Support Bracket
Gas Burner
See Detail A
Pressure
Test
Spigot
Orifice
Temperature
Control
Gas
Manifold
Assembly
1/2—3/4 Reducer
Bushing
Burner
Gas Manifold
Burner/Orifice Location
Detail A
Orifice
1.30-inch [33-mm]
1.63-inch [41-mm]
3.8 Gas Conversion Components
Use the following components to convert from natural gas to propane and vice-versa. See Section
3.6 for orifice quantities required for conversion.
Natural Gas to Propane Kit, 826-1817
Propane To Natural Gas Kit, 826-2017
Bushing, NPT Flush, SR 42 Series only
Bushing, NPT Flush, SR 42 Series only
Pilot orifice (16LP)
Pilot orifice (26N)
Burner orifice*
(See Table on Page 3-9)
Burner orifice*
(See Table on Page 3-9)
Rating label, contact factory at time of
conversion.
Rating label, contact factory at time of
conversion.
* Burner orifices listed on page 3-9 are for fryers operating at altitudes of 2000 feet or less. For
altitudes greater than 2000 feet, contact the factory for the correct orifice size.
Typical gas valve, burner and orifice locations (SM50 shown above).