Installation instructions (ice & water only), Important, All connections must be checked for leaks – Fisher & Paykel E411T User Manual
Page 13
11
Installation instructions (Ice & Water only)
Important!
■
■
All connections must be checked for leaks.
■
■
Ensure white 6 mm (¼”) tubing is routed away from sharp objects, sharp corners (beware of
kinking tube as this will stop water flow), clear of the refrigerator unit compartment and not in a
location where it can be squashed.
■
■
Ensure all push-fit connections are firmly pushed into place. The tube should push in 20 mm (¾”)
before reaching the stop.
■
■
If tubing is removed at any point, re-cut the end and re-insert. Tubing must be fully inserted to
avoid leaks.
■
■
To remove tube from connection points, turn off the isolating tap, push in the collet and gently
pull tubing at the same time.
Fig.9 Connection to water supply
Diagram 9
System tested and certified by NSF International against NSF/ANSI Standard 53 for the reduction
of Asbestos, Atrazine, Benzene, Cyst, Carbofuran, Lead, Lindane, Mercury, P-Dichlorobenzene,
Toxaphene & Turbidity; against Standard NSF/ANSI 42 for the reduction of Chlorine Taste and
Odour and Nominal Particulate Class I to a capacity of 2,838 Litres (750 gallons).