1.6 FINISHING

The minimum clearance to combustibles are 0 from
the sides, floor, back and top (these clearances are
defined by the standoffs). The minimum distance to the
perpendicular side wall extending past the appliance
front is 2-inches (51mm). Clearance to a mantelpiece
is shown in Figure 34.

IF JOINTS BETWEEN THE FINISHED WALLS AND
THE FIREPLACE SURROUND (TOP AND SIDES)
ARE SEALED, A 300° F (149°C). MINIMUM SEAL-
ANT MATERIAL MUST BE USED. THESE JOINTS
ARE NOT REQUIRED TO BE SEALED. ONLY NON-
COMBUSTIBLE MATERIAL (USING 300° F. (149°C)
MINIMUM ADHESIVE, IF NEEDED) CAN BE AP-
PLIED AS FACING TO THE FIREPLACE SUR-
ROUND. SEE FIGURE 34.

½ in.

(12.7mm)

0

SIDE SEAL

JOINT

TOP SEAL

JOINT

CEILING

31

(787)

12

(305)

11

(279)

10

(254)

9

(229)

8

(203)

7

(178)

6

(152)

5

(127)

4

(102)

3

(76)

2

(51)

TOP FRONT EDGE

OF FIREPLACE

NON-COMBUSTIBLE

STRIP

10(254)

8(203)

12(305)

11(279)

9(229)

7(178)

6(152)

5(127)

4(102)

3(76)

2(51)

Note: Dimensions in
inches (mm).