Drilling, Backreaming, Backreaming tips – Ditch Witch JT5 User Manual
Page 46: Jt5 operator’s manual
JT5 Operator’s Manual
Operation Overview - 45
Drilling
CMW
Drilling
1.
2.
Prime drilling fluid pump. See page 76.
3.
Engage tracker control if desired. See page 107.
4.
Drill first pipe. See page 81.
5.
Record bore path. See page 84.
6.
7.
Drill remaining pipes in pipe box and correct direction (page 80) as necessary.
8.
Surface drill head. See page 85.
Backreaming
1.
Assemble backream string. See page 86.
2.
Start drilling unit and adjust throttle.
3.
Set drilling fluid flow. Check that fluid flows through all nozzles. See page 102.
4.
Remove pipe from bore. See page 88.
5.
Remove pullback device. See page 89.
Backreaming Tips
•
Plan backreaming job before drilling. Plan bore path as straight as possible. Check bend limits of
pullback material. Check that appropriate pullback devices are on hand.
•
Keep all bends as gradual as possible.
•
Drilling fluid quality is a key factor in backreaming success. Contact your Ditch Witch dealer for
information on testing water, selecting additives, and mixing drilling fluid.
•
Backreaming requires more fluid than drilling. Make sure enough fluid is used.