beautypg.com

Industrial Injection 2nd Gen Dodge Cummins Compound Turbo User Manual

Page 18

background image

23.

Install battery box using stock bolt in the fender and using the stock nut. Using the remaining heat shield

put on the face of the batter box. Connect and route ground and positive battery cables as needed away

from turbo.

Note: Use this stud and nut for battery tray

24.

Install battery using stock battery bracket along with new battery bracket and bolts and using stock clips

off stock batter tray and secure battery.

HEA

T SHIELD ON FRONT

OF

TRA

Y

25.

Add coolant and check for oil at the turbo feed line on new turbo when tuck is first started. Check for

leaks