Great Plains Auxiliary Hydraulic Kit User Manual
Page 7
Great Plains Mfg., Inc.
Installation Instructions
7
05/05/2009
401-466M
Refer to Figure 15. Figure 14 shows the planter folded in order to
depict the entire routing. Both Figures also show the hoses tied and
clamped; not done at this step.
Route the hoses (
) from the seed cart to the
selector valve
42. Align them with the hose rack
between cart and
wings.
43. Leave a small amount of slack (about 6in inches
side to side) near the wing pivot area
Note: There needs to be sufficient slack at the pivot
point to prevent stress on the hose during folding
and unfolding.
44. Lay them on top of the hose support frame
along the wings.
45. Leave all of the remaining slack at the wing end
,
near the new selector valve.
46. Select one:
502-068D HYD HOSE CLAMP BRACKET
and two each:
802-009C RHSNB 5/16-18X1 1/4 GR5
804-009C WASHER LOCK SPRING 5/16 PLT
803-008C NUT HEX 5/16-18 PLT
47. Insert each round-head carriage bolt
the two square holes in a mount
48. Slide a clamp
over the bolt threads and loosely
attach a lock washer
and nut
49. Place the hoses (
or
) in the clamp and finger-
tighten the nuts.
50. Repeat step 46 through step 49 for each mount
.
Figure 14
Wing Hose Routing
25407
1
2
3
4
2
3
Figure 15
Hoses at Unfolding
25418
Figure 16
Hoses in Wing Clamps
25408
U
D
F
B
L
R