Reconnect marker sequence valve, Tie-wrap hoses, Undle at step 65. align them with that in – Great Plains Auxiliary Hydraulic Kit User Manual
Page 10
Great Plains Mfg., Inc.
10
Auxiliary Hydraulic Kit
401-466M
05/05/2009
Reconnect Marker Sequence Valve
57. Select two:
811-463C HH3/8R2 015 9/16FJIC 9/16FJIC
58. At the marker sequence valve
to the bottom Front port
. Tighten JIC fitting.
59. At the selector valve
, connect the other end of
that hose
to the bottom Front (marker) port
Tighten ORB and JIC fittings.
60. At the marker sequence valve
to the top Front port
61. At the selector valve
, connect the other end of
that hose
to the top Front (marker) port
Tighten ORB and JIC fittings.
Tie-Wrap Hoses
62. Select the set of:
800-060C CABLE TIE .19X14.25 3DIA 50LB
63. Inspect the area at the selector/sequence valves,
and tie any hoses that appear at risk of chaffing or
getting caught in moving parts during folding/
unfolding and planting.
64. Fold the planter. This ensures correct hose length
at the wing pivot point.
65. Use the remaining ties to secure the new hoses
(
or
) along the seed hose bundle and rack.
Figure 20
Re-Connect Sequencer
25412
U
D
F
B
L
R
1
3
2
6
7
1
2
1
3
7