beautypg.com

Install the ductwork, Install support system – Broan E54000 User Manual

Page 8

background image

- 8 -

INSTALL THE DUCTWORK

DUCTED HOODS ONLY

CAUTION: To reduce the risk of fire,

use only metal ductwork.

1. Decide where the ductwork will run

between the hood and the outside.

2. A straight, short duct run will allow the

hood to perform most efficiently.

3. Long duct runs, elbows, and transitions

will reduce the performance of the hood.

Use as few of them as possible. Larger

ducting may be required for best

performance with longer duct runs.

4. Install a roof or wall cap. Connect round

metal ductwork to cap and work back to-

wards hood location. Use duct tape to

seal the joints between ductwork sec-

tions.

INSTALL SUPPORT SYSTEM

1. At hood location, install 2 X 4 cross

framing

between ceiling joists using

dimensions shown.

2. Finish the ceiling surface. Be sure to mark

the location of the ceiling joists and cross

framing.

3. Secure the support frame bracket to joists

and cross framing with four lag bolts

provided (6x70mm) and four washers

(6.4mm). Make sure screws are driven into

center of joists and framing for maximum

strength. Be careful, because the position

of the bracket determines the final position

of the hood: the side with the slot B

corresponds to the controls side. Fig. 2.

FIG. 5

HOOD

ROUND

ELBOW

6”

ROUND

DUCT

ROOF CAP

D E C O R A -

T I V E

F L U E

EAVE

VENT

DRYWALL

8

1

/

16

CROSS FRAMING

CEILING

JOISTS

LAG BOLTS

(6x70mm)

WASHERS

(Ø6.4mm)

SLOT B

FRONT

FIG. 6

TOP VIEW OF SUPPORT FRAME

8

1

/

16

5

15

/

16

FIG. 7

24” to 30” ABOVE

COOKING SURFACE

(See “Prepare Support

Frame” section for

mounting restriction)

3

15

/

16

3”