Prepare the hood, cont’d, Install upper decorative flue – Broan E54000 User Manual
Page 11
- 11 -
FIG.13
NON-DUCTED
RECIRCULATION
PLENUM
FIG.14
DUCT
CONNECTOR
5” METAL
EXPANSION
DUCT
PREPARE THE HOOD, cont’d.
NON-DUCTED HOODS ONLY
3. Install the non-ducted recirculation plenum through the upper rectangular
openings in the support frame. Fig. 13
4. Install the 5” diameter duct connector to plenum. Twist and lock to secure. Fig. 14.
5. Attach 5” diameter metal expandable duct to the plenum. When stretched, it must
be long enough to reach the bottom of the support frame. Fig. 14.
6. Duct tape all joints to make them secure and air tight.
INSTALL UPPER
DECORATIVE FLUE
DUCTED HOODS ONLY
(8-FOOT AND 9-FOOT CEILINGS)
1. Install and secure the upper flue to the
support frame with (2) 2.9x9.5mm
mounting screws. Fig. 15.
•
On 8-foot ceilings, install with air vents
down.
•
On 9-foot ceilings, install upper flue with
air vents up.
(10-FOOT CEILINGS)
2. Discard the upper flue supplied with the
hood. Replace with the upper flue
supplied with flue extension model
FX54SS.
3. Install and secure the upper flue to the
support frame with (2) 2.9x9.5mm
mounting screws.
UPPER
FLUE
MOUNTING SCREWS
(2.9x9.5mm)
FIG.15
VENTS “UP”
VENTS
“DOWN”