beautypg.com

Prepare the hood, Ap1 & rp series page 3 – Broan RP User Manual

Page 3

background image

AP1 & RP SERIES

Page 3

3¼” X 10”

HORIZONTAL DUCTING

CABINET

BOTTOM

CABINET FRONT

HORIZONTAL DUCT

ACCESS HOLE

6¼"

6¼"

3/4

"

HOOD

MOUNTING

SCREWS (4)

ELECTRICAL

ACCESS HOLE

(in wall)

3

7/8

"

CENTER

LINE

WOOD SHIMS

(recessed-bottom

cabinets only)

7

1/2

"

1/8

"

16

15

/

16

"

(36" hood)

16

15

/

16

"

(36" hood)

13

15

/

16

"

(30" hood)

13

15

/

16

"

(30" hood)

PREPARE THE HOOD

4

Blower is shipped in Vertical Discharge Position.

To change blower to

Horizontal Discharge Position:

Remove

Knurled Nuts from Blower Mounting Rods.

Disengage mounting rods from blower and rotate blower

to horizontal discharge position. Re-engage mounting

rods and tighten blower in place with knurled nuts.

3

Remove the

Aluminum Filters, Bottom Cover, and

Wiring Cover from the hood.

9"

CENTER

LINE

HOOD MOUNTING SCREWS (4)

ELECTRICAL

ACCESS HOLE

(in cabinet bottom)

WOOD SHIMS

(recessed-bottom

cabinets only)

CABINET FRONT

CABINET

BOTTOM

16

15

/

16

"

(36" hood)

16

15

/

16

"

(36" hood)

13

15

/

16

"

(30" hood)

13

15

/

16

"

(30" hood)

1

1/2

"

7

1/2

"

VERTICAL DUCT

ACCESS HOLE

6¼"

6¼"

10

5/8

"

6

7/8

"

9

7/8

"

3¼” X 10”

VERTICAL DUCTING

2

Use the proper diagram below, for placement of ductwork

and electrical cutout in cabinet or wall. For a non-ducted

installation, DO NOT cut a duct access hole.

ALUMINUM

FILTERS

BOTTOM

COVER

WIRING

COVER

VERTICAL DISCHARGE POSITION

HORIZONTAL DISCHARGE POSITION

BLOWER

MOUNTING

ROD (2)

KNURLED NUT (2)

BLOWER

MOUNTING

ROD (2)

KNURLED NUT (2)

BLOWER

BLOWER

This manual is related to the following products: