Progressive International Electronics RLM 2 User Manual
Page 8
RLM Systems Installation Guide
Version 3.0 © November 2008
2
SYSTEM INSTALLATION
System Installation Checklist
The line monitoring system should be installed in the following order.
1. Install dispensers and controlling console according to manufacturer’s specifications.
Test dispensers with console for proper operation. See System Installation
Requirements on following page.
2. Install Tank Monitor System according to manufacturer’s specifications. See System
Installation Requirements on following page.
3. Mount RLM. Refer to RLM II and RLM Mech General Installation sections of this
manual.
4. Connect system components to specific dispenser box (DBox). See Dispenser Specific
Installation section for the appropriate brand of dispenser.
5. Test RLM with data through diagnostic port. Refer to Diagnostics section of this
manual.
6. Connect to Tank Monitoring System and test fully integrated system.
System Installation Requirements
In preparation for RLM II (for electronic dispensers) or RLM Mechanical installation, ensure
that the following requirements have been met.
1. Following the manufacturer’s installation instructions, install the dispensing equipment
(dispensers and data distribution boxes).
2. Test all dispensers in stand-alone (manual) mode.
3. Test all dispensers with same brand console to check basic dispenser functionality and
confirm a working communications link between the DBox and the dispensers. On
dispensers which have programmable identification numbers, ensure that the numbers
are set correctly. If multiple dispensers contain the same i.d. number, communication
conflicts will occur.
All dispensers and communications should be functioning properly before proceeding with
RLM installation. If not, refer questions to the dispenser vendor/manufacturer.