beautypg.com

115 v, Warning, Caution – Goodman Mfg GAS-FIRED WARM AIR FURNACE GKS9 User Manual

Page 23

background image

23

6. Insert approximately one inch of each Tube 2 through left

side panel grommet hole. Secure tubes to Hose A and
Hose B with a green hose clamps. NOTE: Tube must
reach bottom of trap. Ensure hoses and tubes maintain a
downward slope for proper drainage and that they are not
kinked or binding.

7. A “Blocked Drain Kit” MUST be installed for left side down

installations. The kit includes a front cover pressure switch
that must be used to protect against a blocked drain
condition. Install the front cover pressure switch per the
instructions included with the “Blocked Drain Kit”. Failure to
install the “Blocked Drain Kit” will void the warranty and could
lead to bodily injury or death.

For details concerning mounting of the drain trap, refer to Section
X, Condensate Drain Lines and Drain Trap - Horizontal Drain Trap
Mounting (Left or Right Side Panel).

H

ORIZONTAL

D

RAIN

T

RAP

M

OUNTING

(L

EFT

OR

R

IGHT

S

IDE

P

ANEL

)

NOTE: This furnace is shipped from the factory as a Dedicated
Upflow. A “Blocked Drain Kit” is available and MUST BE USED if the
furnace is installed Horizontal Left or Horizontal Right. Check the
Serial/ Rating Plate on the furnace for the Kit P/N.

1. Position the drain trap against side panel with drain tubes

inserted into trap. Note that the trap may be orientated with
the outlet facing either the furnace’s top cover or base pan.

2. Secure drain trap to side panel at the dimples or crosshairs

located on either side of the grommet drain holes.

3. Confirm that tubes reach bottom of drain trap and that all

hoses maintain a downward slope and are not kinked or
binding.

4. Attach PVC drain line to drain trap outlet with either a 90°

elbow or coupling.

XI. ELECTRICAL CONNECTIONS

HIGH VOLTAGE!
T

O

AVOID

THE

RISK

OF

ELECTRICAL

SHOCK

,

WIRING

TO

THE

UNIT

MUST

BE

POLARIZED

AND

GROUNDED

.

WARNING

HIGH VOLTAGE!
T

O

AVOID

PERSONAL

INJURY

OR

DEATH

DUE

TO

ELECTRICAL

SHOCK

,

DISCONNECT

ELECTRICAL

POWER

BEFORE

SERVICING

OR

CHANGING

ANY

ELECTRICAL

WIRING

.

WARNING

L

ABEL

ALL

WIRES

PRIOR

TO

DISCONNECTION

WHEN

SERVICING

CONTROLS

. W

IRING

ERRORS

CAN

CAUSE

IMPROPER

AND

DANGEROUS

OPERATION

. V

ERIFY

PROPER

OPERATION

AFTER

SERVICING

.

CAUTION

W

IRING

H

ARNESS

The wiring harness is an integral part of this furnace. Field alter-
ation to comply with electrical codes should not be required. Wires
are color-coded for identification purposes. Refer to the wiring
diagram for wire routings. If any of the original wire as supplied
with the furnace must be replaced, it must be replaced with wiring
material having a temperature rating of at least 105°C. Any re-
placement wiring must be copper conductor.

115 V

OLT

L

INE

C

ONNECTIONS

Before proceeding with electrical connections, ensure that the sup-
ply voltage, frequency, and phase correspond to that specified on
the unit rating plate. Power supply to the furnace must be N.E.C.
Class 1, and must comply with all applicable codes. The furnace
must be electrically grounded in accordance with local codes or, in
their absence, with the latest edition of The National Electric Code,
ANSI NFPA 70 and/or The Canadian Electric Code CSA C22.1.
Use a separate fused branch electrical circuit containing properly
sized wire, and fuse or circuit breaker. The fuse or circuit breaker
must be sized in accordance with the maximum overcurrent pro-
tection specified on the unit rating plate. An electrical disconnect
must be provided at the furnace location.

NOTE: Line polarity must be observed when making field
connections.

I

N

UPRIGHT

UPFLOW

INSTALLATIONS

,

THE

DRAIN

TRAP

MUST

BE

MOUNTED

ON

THE

OPPOSITE

SIDE

OF

THE

UNIT

FROM

THE

JUNCTION

BOX

. T

HIS

WILL

REDUCE

THE

RISK

OF

WATER

REACHING

THE

JUNCTION

BOX

IN

THE

EVENT

OF

A

BLOCKED

DRAIN

CONDITION

.

WARNING

Connect hot, neutral, and ground wires as shown in the wiring
diagram located on the unit’s blower door. For direct vent applica-
tions, the cabinet opening to the junction box must be sealed air
tight using either a UL approved bushing such as Heyco Liquid
Tight or by applying a UL approved non-reactive sealant to bush-
ing.
Line polarity must be observed when making field connections.
Line voltage connections can be made through either the right or
left side panel. The furnace is shipped configured for a left side
electrical connection with the junction box located inside the burner
compartment. To make electrical connections through the oppo-
site side of the furnace, the junction box must be relocated to the
other side of the burner compartment prior to making electrical
connections. To relocate the junction box, follow the steps shown
below.

NOTE: Wire routing must not to interfere with circulator blower
operation, filter removal, or routine maintenance.

E

DGES

OF

SHEET

METAL

HOLES

MAY

BE

SHARP

. U

SE

GLOVES

AS

A

PRECAUTION

WHEN

REMOVING

HOLE

PLUGS

.

WARNING

1. Remove the burner compartment door.
2. Remove and save the two screws securing the junction box

to the side panel.

3. Relocate junction box and associated plugs and grommets

to opposite side panel. Secure with screws removed in
step 2.