7. connecting work clamp, 8. connecting input power – Hobart Welding Products AIRFORCE ICE-27C User Manual
Page 17
OM-203 653 Page 13
4-7. Connecting Work Clamp
802 463-A
1
Work Clamp
2
Workpiece
Connect work clamp to a clean,
paint-free location on workpiece, as
close to cutting area as possible.
1
2
4-8. Connecting Input Power
Ref. 802 787 / 802 786
Check input voltage available at
site.
1
Changeover Switch
Switch is accessible through slot in
rear panel.
2
Changeover Switch Label
Look at label to find correct switch
position.
Y Be sure input power
connection meets all
applicable national,
regional, and local electrical
codes.
3
Grounded 120 VAC
Receptacle
Y To use rated output (see
specifications), connect the
unit to an individual branch
circuit capable of carrying
the effective (eff) current for
the output being used. The
unit must have a properly
sized plug installed and the
circuit must be protected by
properly sized fuses or cir-
cuit breakers.
A 120 volt, 20 ampere individual
branch circuit protected by
time-delay fuses or circuit breaker
is required (see Section 4-1).
4
Plug From Unit
Select extension cord of 12 AWG
for up to 53 ft (16 m).
5
Grounded 230 VAC
Receptacle
A 230 volt, 10 ampere individual
branch circuit protected by
time-delay fuses or circuit breaker
is required (see Section 4-1).
6
Plug From Unit (Customer
Supplied)
Select extension cord of 14 AWG
for up to 133 ft (41 m).
Y Special installation may be
required where gasoline or
volatile liquids are present −
see NEC Article 511 or CEC
Section 20.
4
3
5
6
2
1