beautypg.com

Ds-pan-410-series_omn_8-11 6 – Havis-Shields DS-PAN-413 User Manual

Page 7

background image

www.havis.com • 1-800-524-9900

1)

Tip the Docking Station to a position that is comfortable to work with.

2)

Install all cables that are necessary for computing needs.

3)

Use Zip Ties (Hardware Kit Item 1) to strain relieve cables at rear of

Docking Station.

IF SECURING EXTERNAL ANTENNAS TO DOCKING STATION

(DS-PAN-411-2, DS-PAN-412-2, PKG-DS-PAN-412-2)

LEAVE AN ADEQUATE SERVICE LOOP BETWEEN THE ANTENNA CONNECTOR AND THE FIRST ZIP TIE

ON THE DOCKING STATION TO ENSURE LATCHING AND UNLATCHING MOTION IS NOT RESTRICTED.

4)

Gather all cables to one side and tie off to unused holes on underside

of Docking Station.

6

7

Cable Management

Insert as many zip ties as

necessary to secure cables.

2)

Lower the Docking Station to the Mounting Bracket as shown and secure

with (4) 1/4”-20 x 5/8” long screws (Hardware Kit Item 3). Torque screws

to 80 in-lbs (9.0 Nm) ± 10%.

1/4”-20 Screws

Installation

1)

Remove the Mounting Bracket from the packaging. Install the

Mounting Bracket to the Motion Device using (3) 1/4“-20 x 5/8” long

screws (Hardware Kit Item 3). Torque screws to 80 in-lbs (9.0Nm) ± 10%.

NOTE: Numerous hole patterns present in Mounting Bracket will accomodate Havis Motion

Devices as well as most competitors’

1/4”-20 Screws

Mounting Bracket

Typical Motion Device Example

(not included)

NOTE:

We recommend applying a drop of medium strength (blue)

thread locking adhesive to the threads of all fasteners.

This manual is related to the following products: