Beacon controller – Heatcraft Refrigeration Products BEACON 25001501 User Manual
Page 15
BEACON CONTROLLER
15
To test the Beacon board place the test jumper to the “TEST” position. The board will then cycle through each output for 10
seconds. It will energize and de-energize the fan motor, electric heater, expansion valve and compressor for 10 seconds. When
in the TEST mode the status light flashes quickly. If a sensor is bad it will flash per the error chart. AT THE END OF THE TEST
RETURN THE JUMPER TO THE NORMAL POSITION.
PARTS LIST (Parts Dept. 800-686-7278)
HRPD PART
PART DESCRIPTION
NUMBER
Temperature Sensor
28900101
Transformer 208/240 - 24 volt - 40 VA
22522301
Transformer 208/240 - 24 volt - 75 VA (10HP + up)
22538401
Relay for condenser Fan or Crankcase Heater
22511401
Contactor for Compressor 40 amp with 24 volt Coil
2252440
Control Board for Electric Defrost
28910001
Control Board for Air Defrost
28910002
Terminal Block
2251266
Low Pressure Switch Time Delay Relay
22536801
Electric Expansion Valve
ESV 1 - 24 volt
29310001
ESV 2 - 24 volt
29310002
ESV 4 - 24 volt uni-polar valves
29310003
ESV 6 - 24 volt
29310004
ESV-8 - 24 volt
29310005
ESV-10 - 24 volt
29310006
ESV-25- 24 volt - bi-polar valve
29320001
Expansion Valve Molded Connector
29310007
Optional Pump-Down Switch
22510901
Beacon Smart Controller
89704401
Optional Smart Controller Software Package
89704501
Bi-polar adapter board (only used with 29320001
28920001
expansion valve)
BEACON OPERATIONAL LIMITS
Box set point tolerance ............................ +/-2
°
F
Down to -20
°
F outdoor ambient .............. Allows start-up & operation
Below -20
°
F outdoor ambient ................ Requires head pressure control valve
& pressure fan cycling switch
Controlling box temp. range .................... -25
°
F to 60
°
F
Voltage range at the board ...................... 18 VAC min / 30 VAC max
Surge protection at the board .................. up to 50 VAC